Cost Control Methods

The 2DCM team knows that Budget is key and is observed closely in each phase of the work. We constantly evaluate our designs relative to the budget. We routinely do in-house estimates and hire out-of- house professional estimators as a double set of eyes. During programming, the Team will work closely with Owner to develop and establish a realistic cost model and building component budget.  The cost model will be broken down into component systems, which can then be tracked, monitored and revised as required. During the design phases, the design component systems will be continually evaluated against  the  cost  model. Adjustments  will  be  made  to  the  design  as  required,  in  consultation  with the Owner, to ensure that project costs remain within the budget limits.

 

However, if an estimate indicates that the project is over-budget, then a Value Engineering effort will be initiated. Our approach is a systematic procedure, which enables personnel to focus on the cost of a particular design or system. The objective is to maintain the intent of the project program while reducing cost.  The team will examine items that have a high cost-to-value ratio and propose changes to achieve cost appropriate to value. 

Lydia Patterson Institute

New Facilities Master plan 

St. Mark’s School 

5005 Love Rd.
El Paso, Texas



San Francisco de Assisi

Catholic Church

WhatsApp Image 2025-05-07 at 12.27.36.jpeg

1801 Wyoming, Suite 202

El Paso, Texas 79902

pablo@2dcm-ep.com

Of: (915) 306-1547, ext. 122

© 2025 Powered by 2DCM

© 2025 Powered by 2DCM

bottom of page